River and floodplain management

River and floodplain management measures involve the restoration of a stretch of river and/or its associated floodplain to a more natural functioning state. This can include channel re-meandering or channel feature reinstatement (e.g. measures to restore channel river bars). Where redundant embankments are present, it may also be possible to breach, set back or remove these embankments, restore floodplain connectivity and re-activate floodplain features. Where naturally occurring wood is absent from a river, leaky barriers can be installed. These help attenuate flood flows by slowing and deflecting flow out of the channel on to the floodplain, thereby increasing water storage.

Tarland Catchment, River Dee

Within the Tarland catchment there are historic problems with both flooding and water quality.  Since the year 2000 there have been many projects, carried out by local organisations designed to investigate and solve the problems of diffuse pollution and water management within the catchment. 
 

Logie Burn Restoration, Dee catchment

In early October 2011, a reach of the lower Logie Burn, was reconnected to relict meanders to restore its meandering morphology, river habitat and riparian habitat diversity.  Further aims were to reduce downstream phosphorous and fine sediment transfer into Loch Davan by enhancing in-channel storage capacity and raise the profile of this style of restoration to practitioners and stakeholders in the region. 

Eddleston Water, Tweed Catchment

The aim of the Eddleston project is to assess the impact of restoring natural features and processes on both flood attenuation and the ecology of the river, and also to provide empirical evidence with which to assess the effectiveness of the measures implemented. At the same time, a key element is to work with landowners, farmers and the local community so as to maintain the sustainability of land management at all times.
 

This report (published by CREW) provides a review and analysis of information on the passage by fish at wooden obstacles (woody placements), used for flood management, in Scotland. 
What can be learnt from working with a community to identify what flood risk management measures are needed, are acceptable and which deliver the greatest multiple benefits?
A short policy paper by CREW detailing the issues managers come up against when implementing NFM in relation to UK reservoir legislation.  Information is sought on whether these issues still apply under the new Reservoirs Act.
The 'Land management for increased flood resilience' report was published by CREW and authored by Spray et al., (2015).  The main objectives of the project were to undertake: A large scale survey of farmers’ attitudes to NFM and to the use of potential policy instruments to promote its uptake and delivery; andFarm-scale economic analyses of the impact of NFM measures under different scenarios.See - https://www.crew.ac.uk/publication/land-management-increased-flood-resilience